New Zealand · small-community wastewater

Every small plant. One standard answer.

The Wastewater Infrastructure Accelerator site portal maps every small treatment plant in the programme range. For each one: the community it serves, the plant that is there today, the standard Kubota module that would replace it, what it costs over 35 years, how it is run, and how quickly it can be built.

KTZ biologicalKM-SG membraneRanked immediateBeyond S1-S5 · module scaled or replicated
Finished Kubota community plant at Ashbourne: gravel platform, risers flush with the ground and a single kiosk
What a finished site looks like

A whole town's treatment plant, in a corner of a paddock.

Ashbourne, New South Wales: 100 kL a day (about 400 people, 160 connections) for a new community, installed in about six weeks by True Water and operated under a utility licence. Risers flush with the ground, one kiosk, no ponds, no odour. This is the standard every programme site is built to.

Kubota vessels set in the excavation at Ashbourne Platform, balance tanks and kiosk slab under way Vessels and platform taking shape Plant complete: gravel platform and kiosk
Week 1 · vessels set
Week 1Week 3Week 4Week 6

About six weeks on site. Ashbourne, NSW: vessels set, platform and services built, kiosk connected, and the plant licensed and operating in August 2024. Factory-built modules are why the site programme is measured in weeks, not years.

Kubota vessels being placed in the excavation at Ashbourne
Craned in, completeVessels arrive with the process built in and are set in a day.
Aerial view of the Yarwun membrane plant beside the existing ponds, Gladstone
The ponds stay, and keep workingYarwun, Queensland: a 100 kL/d Kubota membrane plant built beside the existing ponds, which were retained and reused for storage and balancing rather than demolished.
Council and water-board staff being trained at a Kubota plant site
Council staff trained to run itGladstone council and water-board operators trained on site by True Water; the same programme applies to every New Zealand council.
True Water DTR Pty Ltd · exclusive Kubota partner, Australia, New Zealand and the Pacific · prepared for NIFF RFP 12102026WWIARFPBasis and assumptions · Private working draft, not for distribution
Candidate sites0 communitiesin scope
Select a site to open its record and aerial view
Site register

Candidate sites and standard module match

Every site is tagged to the RFP size bracket (S1 to S5), influent scenario and the standard Kubota module that covers its average dry-weather flow. Figures are planning estimates from public sources; see Basis.

Summary

What the candidate sites add up to

Totals follow the current filter on the Map and Sites pages. Figures are planning estimates from public sources.

Plant & equipment

Two technologies, one standard fleet

Factory-built Kubota treatment modules in standard sizes, with the same blowers, pumps, membranes, controls and telemetry at every site. Standardisation is what makes interchangeable spares, one operator training pathway and one compliance dataset possible across the programme.

Module configurator

Pick a system and a module size to see what is delivered: people served, connections, vessels, membrane cassettes, effluent quality and an indicative section. Standard modules are 10, 20 and 50 kL/d; larger flows are met with modules in parallel or a Kubota single-train plant. New Zealand units carry disinfection and treated-effluent chambers inside the same FRP vessel: a second pathogen barrier and a fixed compliance sampling point, with nothing extra on site.

Delivery partners

One accountable lead, a team already working together

True Water is the respondent and single head contractor. Kubota manufactures the plant. The New Zealand partners below have been working with True Water on its NZ programme since before the Accelerator was announced. Select a partner for its profile, role, capability, reference projects and key people.